BAR178 SLOT - AN OVERVIEW

bar178 slot - An Overview

bar178 slot - An Overview

Blog Article

(1) Cylinder shells need to be produced with the backward extrusion system and possess a cleanliness stage enough to ensure right inspection. No fissure or other defect is acceptable that is likely to weaken the finished cylinder beneath the design toughness needs.

(iii) For the goal of pressure measurement, the initial pressure have to be set while the specimen is below a worry of twelve,000 psi plus the strain indicator examining becoming established within the calculated corresponding pressure.

Open up-hearth or electric steel of uniform high quality should be utilized. A heat of metal created underneath table one Within this paragraph (b), Check out chemical analysis of that's somewhat away from the specified array, is suitable, if satisfactory in all other respects, provided the tolerances proven in table 2 Within this paragraph (b) will not be exceeded other than as authorised because of the Affiliate Administrator. The next chemical analyses are approved:

Common taper pipe threads expected in all openings. The duration from the opening may not be a lot less than as specified for American Standard pipe threads; tapped to gauge; cleanse cut, even, and without having checks.

(i) If the chosen cylinder passes the h2o-jacket or direct expansion exam, the remaining cylinders in Every single ton must be force tested from the proof stress water-jacket or direct expansion take a look at method as prescribed in CGA C-1.

(5) All cylinders, if drinking water quenched or quenched that has a liquid creating a cooling amount in excessive of 80 % of the cooling level of drinking water, should be inspected because of the magnetic particle or dye penetrant system to detect the existence of quenching cracks. Any cylinder observed to possess a quench crack need to be turned down and is probably not requalified.

(iv) Permanent volumetric enlargement may well not exceed 10 % of the overall volumetric expansion at test tension.

(i) The porous product may get more info not disintegrate or sag when soaked with solvent or when subjected to standard company;

Every cylinder should be uniformly and adequately heat taken care of, previous to assessments, by any suited process in excessive of 1100 °F. Heat procedure has to be achieved In fact forming and welding functions, besides that when brazed joints are employed, warmth treatment must adhere to any forming and welding functions but could possibly be completed ahead of, through, or after the brazing functions. Liquid quenching is not really licensed.

All spun cylinders and plugged cylinders need to be examined for leakage by gas or air tension immediately after The underside has actually been cleaned and is particularly free of charge from all humidity subject to the next ailments and limitations:

(five) Every single new design and style and any considerable alter to any appropriate style and design have to be certified for output by screening prototype samples as follows:

Notwithstanding the variation supplied in this paragraph, Every container should or else conform to your DOT 2Q container in accordance with § 178.33a. The following situations also apply less than Variation 1—

Cylinders with bottoms shut in by spinning should be subjected to some leakage check by setting the interior air or gasoline tension not to less than the assistance strain. Cylinders which leak have to be turned down.

Inspection need to be performed on the inside of each container ahead of closing and externally on Each individual concluded container just after heat procedure.

Report this page